Project Brief Description: The planned construction area of Tonghe Hanlan Phase 5 newly built plant
is 48,000 square meters, and the main steel structure is about 2,000 tons. The project was completed
from July 15, 2020.The fifirst block material was put into construction to October 15, 2020.All the
projects were installed, which lasted 90 days and was completed 10 days in advanc

Detailed Description

 The planned construction area of Tonghe Hanlan Phase 5 newly built plantis 48,000 square meters, and the main steel structure is about 2,000 tons. The project was completed
from July 15, 2020.The fifirst block material was put into construction to October 15, 2020.All theprojects were installed, which lasted 90 days and was completed 10 days in advance.

Picture display

Once you want to find a factory building to produce concrete or other construction material,this wold be a reliable choice.

 

1(2)
3(1)
4(1)
4(1)

Structure System:Portal frame

Beam and Column: Q345 H steel

Roof purlin: C purlin galvanized

Wall purlin: C purlin galvanized

Roof panel: sandwich panel

Wall panel: sandwicha panel

Built Year: 2020

Application

Industrial factory plant for producing all kinds construction materials.