Wholesale Commercial Building Factory Quotes – Steel Structure Hangar Building In Lightweight – Borton

Wholesale Commercial Building Factory Quotes – Steel Structure Hangar Building In Lightweight – Borton

Short Description:

Product Detail

Product Tags

Related Video

Feedback (2)

Our primary intention should be to offer our clientele a serious and responsible enterprise relationship, delivering personalized attention to all of them for Prefab Barn House , corrugated steel shed , Prefab Shed Homes , As a leading manufacture and exporter, we appreciate a great status inside the international markets, especially in America and Europe, because of our top high-quality and sensible charges.
Wholesale Commercial Building Factory Quotes – Steel Structure Hangar Building In Lightweight – Borton Detail:

Product Detail

Steel structure building mainly refers to the main steel frame are composed of steel structure,including steel column,steel beam and steel roof truss,including steel structure workshop,steel structure warehouse,steel structure exhibition hall,steel structure stadium etc.Steel hangar is a closed building structure to hold aircraft or spacecraft,it can also named airplane hangar,aircraft hangar,airplane workshop,aircraft warehouse.As a good example of steel structure building,it is favored by buyers.

Picture display

The features

1.Steel hangar requires a large span and large space,concrete or wooden structure are difficult to meet or the cost will be high.
2.Steel hangars require extremely high security as airplanes always are at high cost.Steel structure is lightweight ,but with high strength. It has better performance on safety than general structures.
3.Steel hangars has beautiful appearance,various shapes can be realized,especilly the ones in airport.Airport is an important window connecting the city to the outside.Steel structure hangars in unique design can leave a deep impression.
4.80% of steel components can be finished at factory,only need to be connected by bolts on site.It is an easy and fast installation.

The Application

1.Military aircraft hangar
2.Civil aircraft hangar
3.Private hangar
4.Aircraft maintenance warehouse
5.Airport terminal building
6.Aircraft assembly workshop

Product parameters

Main steel frame Column Q235 or Q345,Welded H section steel or steel truss
Beam Q235 or Q345,Welded H section steel or steel truss
Secondary frame Purlin Q235,C or Z section steel
Knee brace Q235,L50*4
Tie rod Q235 ,steel pipe
Brace Q235,φ20 round bar or angle steel
Maintenance system Roof cladding EPS/fiberglass/rock wool/PU sandwich panel or corrugated steel sheet
Wall cladding EPS/fiberglass/rock wool/PU sandwich panel,glass curtain, aluminium sheet ,corrugated steel sheet for choice
 Accessories Window Aluminium alloy window
Door Electric hangar door,sliding door
Fastener  High strengthen bolt,normal bolt,self tapping screw,etc.
Rain spout PVC
Trim 0.5mm corrugated steel sheet
Surface treatment Painted or galvanized
Service life Up to 50 years
Wind resistance grade 12 grades
Certification CE,SGS,ISO

Process Description

1.Design process
The terminal building and steel hangar will be calculated and controlled according to the highest safety level, service time is up to 50 years.After design solution finished,another enginner check it again is damanded,to ensure the best solution in safe and low cost.
Engineering Design Software:
AutoCAD,PKPM,MTS,3D3S,Tarch,Tekla Structures(X steel)V12.0.etc

hangar-dra
2.Production process
All components of steel hangar as well as hangar door will be manufactured in factory.Fabrication should strictly according to drawing to ensure the high precision. It can be re-inspected by a third party for processing,such as CE,SGS,ISO and so on.
3.Installation process
Steel components are connected by bolts, with fast speed, high precision and few hidden safety hazards. Labor cost reduce 30% compared with the traditional concrete one.Our own installation team consist of skilled workers and professional techinical enginner will complete the construction on site.

Packaging &Delivery

Packaging details
1.Connecting plate on steel structure willl be packaged with bubble plastic,to protect the paint on them from being knocked off during transportation.
2.Sandwich panels and corrugated steel sheet will be packed with plastic film if need.
3.Bolts will be packed in wooden boxes with detailed list.
4.All goods will be loaded in 40’HQ container,40GP and 20GP container are ok if necessary.And if there are requirements on weight,it needs to be informed before loading.

Packing-an

Port
Qingdao Port or as required.
Delivery time
30-45 days after deposit or L/C received and the drawing is confirmed by buyer.Pls disscuss with us to decide it.


Product detail pictures:


Related Product Guide:

With our leading technology as well as our spirit of innovation,mutual cooperation, benefits and development, we will build a prosperous future together with your esteemed company for Wholesale Commercial Building Factory Quotes – Steel Structure Hangar Building In Lightweight – Borton, The product will supply to all over the world, such as: Netherlands, Sydney, Mali, Whether selecting a current product from our catalog or seeking engineering assistance for your application, you can talk to our customer service center about your sourcing requirements. We can provided good quality with competitive price for you personally.
The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
5 Stars By Dawn from Zimbabwe - 2017.03.28 12:22
We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
5 Stars By Queena from Poland - 2018.12.25 12:43

Related Products