China Workshop Exporters – Steel Structure High Rise Building – Borton

China Workshop Exporters – Steel Structure High Rise Building – Borton

Short Description:

Product Detail

Product Tags

Related Video

Feedback (2)

Fast and great quotations, informed advisers to help you choose the correct product that suits all your preferences, a short creation time, responsible top quality control and different services for paying and shipping affairs for steel building fabrication , Factory Workshop , Steel Structure , How about to start your good organization with our corporation? We are all set, properly trained and fulfilled with pride. Let’s start our new business enterprise with new wave.
China Workshop Exporters – Steel Structure High Rise Building – Borton Detail:

Product Description

A high-rise building is a tall building, as opposed to a low-rise building and is defined differently in terms of height depending on the jurisdiction. High rise building has a lot of functions, can be used as residential,office building,hotel as well as industrial building,such as commercial concrete station.The main steel structure can be portal steel frame structure or a frame structure.Steel structure today is more and more popular and useful for high rise building project.

Picture display

The Features

1.Steel structure is lighter. The “bulk density to strength ratio” of steel is generally smaller than that of wood, concrete, and masonry. Therefore, steel structures are lighter, 30%-50% lighter than reinforced concrete structures. Foundation will be smaller if use steel structure building.
2. More space to use. Steel structures have small cross-sections and increase the effective area of the building by about 8% compared with reinforced concrete structures.
3. Time & labor is less. Steel structures are fabricated in factory and installed on site with bolts & screws, which will greatly reduce the erection time and need less workers.
4. Faster construction. Steel buildings are light, bolted and screwed on site which help the construction more quick

The Application

1.Residential building
2.Hotel
3.Office building
4.Aircraft hangar
5.Commercial concrete station
6.Other buildings in high

Technical Specification

Standard GB.If others,pls indicate in advance.
Place of Origin Qingdao city,China
Certificate SGS, ISO ,CE ,etc.
Size As required
Steel grade Q235 or Q355
Surface Treatment Painted or galvanized
Color of paint Mid-gray,white,blue or as required
Main material Steel pipe truss,C steel,corrugated steel sheet,etc.
Accessories High strengthen bolt,normal bolt,self-tapping screw,etc.
Design parameters Wind load,snow load,the degree of earthquake,etc.
Design software PKPM,Tekla,3D3S,Auto CAD,SketchUp etc.
Service Guide Installation or construction on Site

Process Description

1.Design process:
(1)As a public building,safety is the most important.So,the materials to be used must be good waterproof and fireproof.
(2)The wind load,snow load,the degree of earthquake(the maxinium in the past 50 years in noraml )should be considered when design.Ensure the safety of the shopping mall from the design source!
(3)For such steel building, beautiful appearance is requested.Thus,it should be considered when design.
(4)More than 100 senior engineers will provide professional support by PKPM,Tekla,3D3S,Auto CAD,SketchUp etc.
2.Production process
For such steel structure,high accuracy is damanded.All-round factory quality control of materials, processing, and welding must be carried out to ensure the quality of the components.
The most skilled workers will participate in the full manufacture ,on the other hand,the advanced equipments contribute to it.
3.Installation process
The construction can be accomplished by us or by yourself.If us,Professional engineer and skilled workers will go to the site.Otherwise,video and pictures will be sent for reference.

steel structure  equipment
production process (1)
production process (2)

Packaging &Delivery

Packaging Details:
Steel frame will be packaged by customized steel pallet;
Fasten accerssories packing in wood carton;
Or as required
Normally is 40’HQ container.If you have specifical requirements,40GP and 20GP container are ok.
Port:
Qingdao port,China.
Or other ports as required.
Delivery time:
45-60 days after deposit or L/C received and the drawing is confirmed by buyer.Pls disscuss with us to decide it.


Product detail pictures:


Related Product Guide:

It is a good way to improve our products and service. Our mission is to develop creative products to customers with a good experience for China Workshop Exporters – Steel Structure High Rise Building – Borton, The product will supply to all over the world, such as: Chicago, Macedonia, Azerbaijan, All styles appear on our website are for customizing. We meet up to personal requirements with all products of your very own styles. Our concept is to help presenting the confidence of each buyers with the offering of our most sincere service, and the right product.
The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
5 Stars By Julie from Mexico - 2018.09.29 17:23
It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
5 Stars By Josephine from Rwanda - 2017.09.30 16:36

Related Products