Short Description:

Product Detail

Product Tags

Related Video

Feedback (2)

With reliable excellent approach, great name and ideal consumer services, the series of products and solutions produced by our company are exported to many countries and regions for Poultry House , portable metal sheds , Steel Building , We are confident that there will be a promising future and we hope we can have long term cooperation with customers from all over the world.
China Water Plant Manufacturers Suppliers – Light Steel Structure Prefabricated Building – Borton Detail:

Product Detail

Steel structure prefabricated building is a new environmentally friendly building,it is trend of building in future.Nearly all kinds of building could be built by steel structure design system including civil building,commercial building,industrial building,agricultural building and so on,Compared with traditional concrete buildings,steel structure building is better in structure strength,anti-earthquake and space utilization.Installation is quick due to prefabriated components.Moreover,because steel id reusable,so,it is more environmentally friendly.Now,steel structure technology is a mature technology in high-rise building and super high-rise buildings.It has became mainstream in construction design.

Picture display

The advantages

1.Quick installation:
All steel structure parts are pre-fabricated in the factory and then shipped to the site for direct installation. Customers do not need to be welded at the site, reducing installation time.
2.Ample internal use space:
The steel structure prefabricated building has a large span, except for the pillars supporting the roof steel beams on both sides,there are no pillars inside. The forklift will not encounter obstacles during internal travel, which significantly improves the used space.
3.Building materials can be recycled:
90% of the steel structure prefabricated building materials can be recycled, which improves the reuse rate of materials.
4.Environmental-friendly
During the construction process, there is no construction waste and dust, no water is needed, water saved, and there is no noise, which will not affect the average life of surrounding residents.

Product parameters

1 Steel structure Q235 or Q345,column and beam ,which are generally assembled and welded with hot-rolled H section steel or steel plates.
2 Purlin Q235 or Q345,C or Z section channel
3 Roof cladding sandwich panel or corrugated steel sheet
4 Wall cladding sandwich panel ,glass curtain,aluminium panel for choice
5 Sag rod Q235,circular steel tube
6 Bracing Q235,steel rod, L angle, or square tube.
7 Column&transverse brace Q235,angle steel or H section steel or steel pipe
8 Knee brace  Q235,L 50*4
10 Rainspout PVC pipe
11 Door Sliding Door/Rolling Door
12 Windows Plastic Steel Window/Aluminum-alloy Window

steel frame
steel structure  material
steel material

Fabrication description

Step 1 Blanking

Checking specifications,quality and appearance of raw material,then cutting steel plate into sizes required by Numerical Control Cutting Machine.

fabrication description (1)
fabrication description (2)

Step 2 Formation

Fixing the flange plates and the web.The gap between the flange plate and the web must not exceed 1.0mm.

fabrication description (3)
fabrication description (4)

Step 3 Sybmerged Arc Welding

Welding the flange plates and the web. The welding seam surface must be smooth without any holes and slags.

fabrication description (5)
fabrication description (6)

Step 4 Correcting

There will be greater welding deformation after welding the flange plates and web together, and also deviation of the squareness. Therefore, it is necessary to correct the welded H-steel by straightener.

fabrication description (7)
fabrication description (8)

Step 5 Drilling

After drilling, burrs must be cleaned up without damaging the base metal. If the deviation of the hole distance is beyond the specified scope, the quality of electrode must be as same as the base metal. Drill again after polishing smooth.

fabrication description (9)

Step 6 Assembling

Strictly follow the drawing to assemble and consider the pre-welding shrinkage according to the characteristics of steel components. Then,continue processing after confirming without any error.

fabrication description (10)

Step 7

CO2 Gas Shielded Welding

fabrication description (11)

Step 8 Shot Blasting

By shot blasting, the surface roughness will be gained, which can increase the adhesion of paint film and imporve the surface quality of paint and preservative effect.

fabrication description (12)
fabrication description (13)

Step 9 Straightening, Cleaning and Polishing

fabrication description (14)
fabrication description (15)

Step 10 Painting

fabrication description (16)

Step 11 Spraying and Packaging

fabrication description (17)
fabrication description (18)

Step 12 Finished products storaging

fabrication description (19)

Construction on site

Drawing and quotation

Drawing and quotation will be offered within 1 day once the details are informed.Customized drawign are welcomed,it doesn’t matter even if there is no one.
A. Customers have the drawings
We can provide you the full service of production, shipment and
Installation guide, which is high quality and low cost. Because we own all kinds of technical facilities, complete test instruments and advanced production processes.
B. No drawings
Our excellent design team will freely design the light steel structure warehouse/workshop for you. If you give us the following information, we will give you an satisfactory drawing.
1. Dimension: length, width, ridge height, eave height, etc.
2. Doors and Windows: dimension, quantity, installation position.
3. Local Climate: wind load, snow load, roof load, Seismic load
4. Insulation materials: Insulated sandwich panel or corrugated steel sheet
5. Crane beam: If you need it, it will be very helpful that you tell us its technological parameters.
6. Usage: If you tell us the application of light steel structure warehouse, we can exactly design the drawings or match suitable materials for you.
7. Other requirements: such as fire proofing, transparent roof, etc. Please kindly inform us, too.

Packaging &Delivery

Packaging Details:
Steel frame will be packaged by customized steel pallet;
Fasten accerssories packing in wood carton;
Or as required
Normally is 40’HQ container.If you have specifical requirements,40GP and 20GP container are ok.

Port:
Qingdao port,China.
Or other ports as required.

Delivery time:
45-60 days after deposit or L/C received and the drawing is confirmed by buyer.Pls discuss with us to decide it.


Product detail pictures:


Related Product Guide:

Dependable high-quality and fantastic credit standing are our principles, which will help us at a top-ranking position. Adhering to your tenet of "quality very first, client supreme" for China Water Plant Manufacturers Suppliers – Light Steel Structure Prefabricated Building – Borton, The product will supply to all over the world, such as: El Salvador, Georgia, Holland, We welcome you to visit our company, factory and our showroom displayed various products that will meet your expectation, meanwhile, it is convenient to visit our website, our sales staff will try their efforts to provide you the best service. If you need more information, please do not hesitate to contact us by E-mail or telephone.
This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
5 Stars By Dorothy from Roman - 2018.10.01 14:14
As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
5 Stars By Hilda from San Francisco - 2018.12.10 19:03

Related Products