China 20×20 metal shed Exporters – Hot-Dip Galvanized Elevated Steel Water Tank Tower – Borton

China 20×20 metal shed Exporters – Hot-Dip Galvanized Elevated Steel Water Tank Tower – Borton

Short Description:

Product Detail

Product Tags

Related Video

Feedback (2)

Gaining purchaser gratification is our firm's intention eternally. We will make wonderful endeavours to build new and top-quality merchandise, satisfy your exclusive needs and provide you with pre-sale, on-sale and after-sale products and services for Prefabricated Steel Plant , Storage Shed , Steel Workshop Buildings , We welcome customers all over the word to contact us for future business relationships. Our products are the best. Once Selected, Perfect Forever!
China 20×20 metal shed Exporters – Hot-Dip Galvanized Elevated Steel Water Tank Tower – Borton Detail:

Product Detail

Water tank steel tower is widely used in storage and regulation of living water supply,construction water supply,and temporary water storage tanks for expansion of the heating system,condensate tank and construction,geological survey,industry,national defense project etc.

The water tank materials including hot dipped galvanized, pre-galvanized, GRP, stainless steel four types. The famous type is hot dipped galvanized,  the thickness of the hot dip galvanizing coat is about 80 µm, good performance in anti corrosive and apprearance. The purpose is to ensure extended maintenance free life in situations where water with aggressively corrosive properties is required to be stored. 

Design Model

Picture Show

The features

1) Economic: quick installed and saving the cost of construction.
2) Reliable quality: mainly produced in the factory and control the quality.
3) Anti-seismic: because the weight is light.
4) Flexible: can be dismantled and enlarged.
5) Beautiful appearance: modern design solution and painted or galvainzed surface treatment.
6) Long lifespan: can be used more than 50 years

Technical Specification

Standard GB.If others,pls indicate in advance.
Place of Origin Qingdao city,China
Certificate SGS, ISO ,CE ,etc.
Size As required
Steel grade Q235 or Q355
Surface Treatment Painted or galvanized
Color of paint Mid-gray,white,blue or as required
Main material Steel pipe truss,C steel,corrugated steel sheet,etc.
Accessories High strengthen bolt,normal bolt,self-tapping screw,etc.
Design parameters Wind load,snow load,the degree of earthquake,etc.
Design software PKPM,Tekla,3D3S,Auto CAD,SketchUp etc.
Service Guide Installation or construction on Site

Process Description

1.Design process:
(1)The overhead tank and steel tower specifications can be designed by us , or do it according to client’s design drawings. The steel stand can be designed with the walkway, the ladder with safe hoop, the handrail based on client request. 
(2)The wind load,snow load,the degree of earthquake(the maxinium in the past 50 years in noraml )should be considered when design.Ensure the safety of the Stadium from the design source!
(3)More than 100 senior engineers will provide professional support by PKPM,Tekla,3D3S,Auto CAD,SketchUp etc.
2.Production process
For such steel structure,high accuracy is damanded.All-round factory quality control of materials, processing, and welding must be carried out to ensure the quality of the components.
The most skilled workers will participate in the full manufacture ,on the other hand,the advanced equipments contribute to it.

production process (2) production process (1) steel structure  equipment

3.Installation process
The quality of installation is related to the safety of future. For such light steel garage,it is recommended that the construction is accomplished by yourself due to it is easy and fast.Installation drawing and video will be sent to you for reference.Of course,it is ok if need our enginner and workers for guidance.

Packaging &Delivery

Packaging Details:
Steel frame will be packaged by customized steel pallet;
Fasten accerssories packing in wood carton;
Or as required
Normally is 40’HQ container.If you have specifical requirements,40GP and 20GP container are ok.
Port:
Qingdao port,China.
Or other ports as required.
Delivery time:
45-60 days after deposit or L/C received and the drawing is confirmed by buyer.Pls disscuss with us to decide it.


Product detail pictures:

China 20×20 metal shed Exporters –  Hot-Dip Galvanized Elevated Steel Water Tank Tower  – Borton detail pictures

China 20×20 metal shed Exporters –  Hot-Dip Galvanized Elevated Steel Water Tank Tower  – Borton detail pictures

China 20×20 metal shed Exporters –  Hot-Dip Galvanized Elevated Steel Water Tank Tower  – Borton detail pictures

China 20×20 metal shed Exporters –  Hot-Dip Galvanized Elevated Steel Water Tank Tower  – Borton detail pictures


Related Product Guide:

abide by the contract", conforms on the market requirement, joins within the market competition by its superior quality likewise as provides far more comprehensive and great company for shoppers to let them develop into huge winner. The pursue on the corporation, is definitely the clients' gratification for China 20×20 metal shed Exporters – Hot-Dip Galvanized Elevated Steel Water Tank Tower – Borton, The product will supply to all over the world, such as: Bolivia, Greenland, Cannes, Our solutions have national accreditation requirements for qualified, good quality items, affordable value, was welcomed by individuals all over the world. Our goods will continue to improve inside the order and appear forward to cooperation with you, Really should any of those items be of interest to you, please letus know. We will be satisfied to provide you a quotation up on receipt of the detailed needs.
  • We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
    5 Stars By Rosemary from Auckland - 2017.09.26 12:12
    The quality of the products is very good, especially in the details, can be seen that the company work actively to satisfy customer's interest, a nice supplier.
    5 Stars By Faithe from Spain - 2017.12.09 14:01

    Related Products