China 2 Story Mobile Homes Manufacturers Suppliers – Fast Installaed And Easy Move Steel Structure Prefab House – Borton

China 2 Story Mobile Homes Manufacturers Suppliers – Fast Installaed And Easy Move Steel Structure Prefab House – Borton

Short Description:

Product Detail

Product Tags

Related Video

Feedback (2)

We also supply merchandise sourcing and flight consolidation companies. We now have our very own manufacturing facility and sourcing business. We could present you with almost every kind of product relevant to our solution array for Steel Beams For Building , Steel Supermarket , House Product , Sincerely look forward to serving you in the near future. You are sincerely welcome to visit our company to talk business face to face with each other and establish long-term co-operation with us!
China 2 Story Mobile Homes Manufacturers Suppliers – Fast Installaed And Easy Move Steel Structure Prefab House – Borton Detail:

Product Description

The features

a.Low maintenance costs
b.Environmentally friendly, recycling.
c.Flexibility when fixing doors, windows and interior partitions
d.Steel structure construction is strong, durability and stable.
e.Steel components is resistant to termites and other destructive insects.
f.Long service life for more than 30 years
g.Fast construction ,easy installation and convenient to transport.

Technical Specification

Technical Specification

 

Standard GB.If others,pls indicate in advance.
Place of Origin Qingdao city,China
Certificate SGS, ISO ,CE ,etc.
Size As required
Main frame Q235 or Q355 square tube or C steel
Surface Treatment Painted or galvanized
Color of paint Mid-gray,white,blue or as required
Cladding material Corrugated steel sheet,EPS/fiberglass/rock wool/PU sandwich panel are ok.
Accessories High strengthen bolt,normal bolt,covering sheet,trim and flashing,etc.
Service Guide Installation or construction on Site

Packaging &Delivery

Packaging Details:
Steel frame will be packaged by customized steel pallet;
Fasten accerssories packing in wood carton;
Or as required
Normally is 40’HQ container.If you have specifical requirements,40GP and 20GP container are ok.
Port:
Qingdao port,China.
Or other ports as required.
Delivery time:
45-60 days after deposit or L/C received and the drawing is confirmed by buyer.Pls disscuss with us to decide it.

Why choose us

1-Customized design service
2-Quality Assurance Service
*Safety packing
*Insurance services
*Inspection before shipment
3-After-sales service
*Engineer guide on site
*Installation team service
*Email/phone call communication


Product detail pictures:

China 2 Story Mobile Homes Manufacturers Suppliers –  Fast Installaed And Easy Move Steel Structure Prefab House  – Borton detail pictures

China 2 Story Mobile Homes Manufacturers Suppliers –  Fast Installaed And Easy Move Steel Structure Prefab House  – Borton detail pictures

China 2 Story Mobile Homes Manufacturers Suppliers –  Fast Installaed And Easy Move Steel Structure Prefab House  – Borton detail pictures

China 2 Story Mobile Homes Manufacturers Suppliers –  Fast Installaed And Easy Move Steel Structure Prefab House  – Borton detail pictures

China 2 Story Mobile Homes Manufacturers Suppliers –  Fast Installaed And Easy Move Steel Structure Prefab House  – Borton detail pictures

China 2 Story Mobile Homes Manufacturers Suppliers –  Fast Installaed And Easy Move Steel Structure Prefab House  – Borton detail pictures

China 2 Story Mobile Homes Manufacturers Suppliers –  Fast Installaed And Easy Move Steel Structure Prefab House  – Borton detail pictures


Related Product Guide:

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of China 2 Story Mobile Homes Manufacturers Suppliers – Fast Installaed And Easy Move Steel Structure Prefab House – Borton, The product will supply to all over the world, such as: Egypt, Irish, venezuela, Why we can do these? Because: A, We are honest and reliable. Our products have high quality, attractive price, sufficient supply capacity and perfect service. B, Our geographical position has a big advantage . C, Various types: Welcome your inquiry, It will be highly appreciated.
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Monica from Brisbane - 2017.02.18 15:54
    Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By Hedda from Uganda - 2017.12.02 14:11

    Related Products