Fast Installaed And Easy Move Steel Structure Prefab House

Fast Installaed And Easy Move Steel Structure Prefab House

Short Description:

Steel structure prefab house is made of prefab light steel as house frame and sandwich panel as wall and roof, then facilitated with windows, doors, flooring, ceiling, and other additional accessories.As a residential house,it is more and more popular.

Product Detail

Product Tags

Product Description

Compared with large steel structure building,prefab houses are simply prefab for residential modular steel structure prefab house (steel structure villa,family house,affrodable house,steel structure hotel ), made by simple steel frame (C section steel,angle steel,square tube and so on), phenolic aldehyde sandwich panel,aluminium alloy window,sandwich panel door,PVC ceiling and so on.And The sizes can be customized as customer request.The characteristic of this kind of building is all columns of the building are hided in the building, there is no column and X bracing at external wall,all columns are square tube,more stronger and beautiful than low cost prefab house . And the color of steel sheet looks more environmental and more comfortable .

The features

a.Low maintenance costs
b.Environmentally friendly, recycling.
c.Flexibility when fixing doors, windows and interior partitions
d.Steel structure construction is strong, durability and stable.
e.Steel components is resistant to termites and other destructive insects.
f.Long service life for more than 30 years
g.Fast construction ,easy installation and convenient to transport.

Technical Specification

Technical Specification

 

Standard GB.If others,pls indicate in advance.
Place of Origin Qingdao city,China
Certificate SGS, ISO ,CE ,etc.
Size As required
Main frame Q235 or Q355 square tube or C steel
Surface Treatment Painted or galvanized
Color of paint Mid-gray,white,blue or as required
Cladding material Corrugated steel sheet,EPS/fiberglass/rock wool/PU sandwich panel are ok.
Accessories High strengthen bolt,normal bolt,covering sheet,trim and flashing,etc.
Service Guide Installation or construction on Site

Packaging &Delivery

Packaging Details:
Steel frame will be packaged by customized steel pallet;
Fasten accerssories packing in wood carton;
Or as required
Normally is 40’HQ container.If you have specifical requirements,40GP and 20GP container are ok.
Port:
Qingdao port,China.
Or other ports as required.
Delivery time:
45-60 days after deposit or L/C received and the drawing is confirmed by buyer.Pls disscuss with us to decide it.

Why choose us

1-Customized design service
2-Quality Assurance Service
*Safety packing
*Insurance services
*Inspection before shipment
3-After-sales service
*Engineer guide on site
*Installation team service
*Email/phone call communication


  • Previous:
  • Next:

  • Related Products