Short Lead Time For Prefabricated Office Space - Steel Structure Shopping Mall Building – Borton

Short Lead Time For Prefabricated Office Space - Steel Structure Shopping Mall Building – Borton

Short Description:

Product Detail

Product Tags

Related Video

Feedback (2)

Our mission should be to turn out to be an innovative supplier of high-tech digital and communication devices by furnishing benefit added design and style, world-class manufacturing, and repair capabilities for Steel Girder Bridge , Pu Panel For Cold Room , Steel Structure Supermarket , We sincerely welcome overseas customers to consult for the long-term cooperation and the mutual development.
Short Lead Time For Prefabricated Office Space - Steel Structure Shopping Mall Building – Borton Detail:

Product Description

Steel structure building are cited as green products of the 21st century.They are efficient,fast,energy-saving,high-efficiency,large space,low cost,pollution-free and reusable.They are being widely used in large steel plant,steel structure exhibition hall,steel structure supermarket,industrial steel workshop,steel warehouse and other steel structure buildings,and are favored by users.Steel structure shopping building is also called steel framed mall building, structural steel supermarket,steel structure commercial building,using a combination of metal construction and pre-fabricated components.

Picture display

Outside

Inside

The Features

1) Anti-seismic: Most shopping building use slope roofing which usually use truss system. The roofing system will be very strong after the truss was sealed with panels and gypsum board. This kind of structure system can against 8-degree earthquake, and has high strength of loading capability.
2) Good Performance for against wind: Light weight, high strength, good integrity, easy to deform, all these advantages make light steel building good performance for against wind.
3) Durability: Light steel shopping building made its life span of the structure more than 50 years.
4) Heat Preservation Performance: Heat preservation: it is used sandwich panel as insulation and effectively avoid the phenomenon of cold bridge of the wall body.
5) Healthiness: Dry construction, minimum waste to the environment, and 100% recyclable of the materials, all these advantages are conform to the consciousness of environmental protection. Whats more, the materials we use are all green materials, which are good for peoples health.
6) Comfort: Light steel wall system adopts highly efficient energy-saving system with respiration function to adjust the humidity of the room; With ventilation function in the roof, ensuring the ventilation and hot scattering of the room, thus make the room more comfortable.
7) Termite resistant: The light steel buildings can completely resist termite invasion, thus extending the life span of the building and decrease the repair cost.

The Application

1.Steel Structure shopping mall
2.Steel structure supermarket
3.Home plaza
4.Building material plaza
5.Hotel
6.Restaurant
7.Amusement park
8.Indoor stadium

Technical Specification

Standard GB.If others,pls indicate in advance.
Place of Origin Qingdao city,China
Certificate SGS, ISO ,CE ,etc.
Size As required
Steel grade Q235 or Q355
Surface Treatment Painted or galvanized
Color of paint Mid-gray,white,blue or as required
Main material Steel pipe truss,C steel,corrugated steel sheet,etc.
Accessories High strengthen bolt,normal bolt,self-tapping screw,etc.
Design parameters Wind load,snow load,the degree of earthquake,etc.
Design software PKPM,Tekla,3D3S,Auto CAD,SketchUp etc.
Service Guide Installation or construction on Site

Process Description

1.Design process:

(1)As a public building,safety is the most important.So,the materials to be used must be good waterproof and fireproof.
(2)The wind load,snow load,the degree of earthquake(the maxinium in the past 50 years in noraml )should be considered when design.Ensure the safety of the shopping mall from the design source!
(3)For such steel building, beautiful appearance is requested.Thus,it should be considered when design.
(4)More than 100 senior engineers will provide professional support by PKPM,Tekla,3D3S,Auto CAD,SketchUp etc.
2.Production process

For such steel structure,high accuracy is damanded.All-round factory quality control of materials, processing, and welding must be carried out to ensure the quality of the components.
The most skilled workers will participate in the full manufacture ,on the other hand,the advanced equipments contribute to it.
3.Installation process

The construction can be accomplished by us or by yourself.If us,Professional engineer and skilled workers will go to the site.Otherwise,video and pictures will be sent for reference.

steel structure  equipment
production process (1)
production process (2)

Packaging &Delivery

Packaging Details:
Steel frame will be packaged by customized steel pallet;
Fasten accerssories packing in wood carton;
Or as required
Normally is 40’HQ container.If you have specifical requirements,40GP and 20GP container are ok.
Port:
Qingdao port,China.
Or other ports as required.
Delivery time:
45-60 days after deposit or L/C received and the drawing is confirmed by buyer.Pls disscuss with us to decide it.


Product detail pictures:

Short Lead Time For Prefabricated Office Space - Steel Structure Shopping Mall Building  – Borton detail pictures

Short Lead Time For Prefabricated Office Space - Steel Structure Shopping Mall Building  – Borton detail pictures

Short Lead Time For Prefabricated Office Space - Steel Structure Shopping Mall Building  – Borton detail pictures

Short Lead Time For Prefabricated Office Space - Steel Structure Shopping Mall Building  – Borton detail pictures

Short Lead Time For Prefabricated Office Space - Steel Structure Shopping Mall Building  – Borton detail pictures


Related Product Guide:

By using a full scientific excellent administration method, great quality and fantastic religion, we get good reputation and occupied this discipline for Short Lead Time For Prefabricated Office Space - Steel Structure Shopping Mall Building – Borton, The product will supply to all over the world, such as: Germany, Qatar, Bolivia, Our Company policy is "quality first, to be better and stronger, sustainable development" . Our pursuit goals is "for society, customers, employees, partners and enterprises to seek reasonable benefit". We aspirate to do cooperate with all different the auto parts manufacturers, repair shop, auto peer , then create a beautiful future! Thank you for taking time to browse our website and we would welcome any suggestions you may have that can help us to improve our site.
  • This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
    5 Stars By Frederica from Nepal - 2017.03.08 14:45
    The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Tony from Kuwait - 2017.04.18 16:45

    Related Products