This ceramic plant project covers 3 hangars,9700sqm in total.One is a workshop for production with an area of 7700 square meters, the height reaches 27.8 meters.The others ones are steel warehouse for storage with mezzanine office ,covers 2000 square meters in total.
For this construction,the design,fabrication as well as construction are done by us.Detailed information below:
No. | Item | Description |
1 | Column, Beam | H section steels with anti-rust gray painting |
2 | Purlin | Galvanized purlins |
3 | Secondary Support | Galvanization, e.g. tie bracing, bracing bars, angle steels, all these will improve the stability and durability of the whole structural building. |
4 | Roof & Wall | Alu-zinc color-coated steel sheet in the thickness of 0.5mm |
5 | Window | Aluminum-alloy sliding windows |
6 | Door | Steel Door, Fire-proof Door |
7 | Construction service | On-site installation for 7 months. |